PROJECTS
Projects
With 55 completed and ongoing contracts, Bozak Enerji has reached a total contract volume of approximately TRY 3.92 billion.
Projects in numbers
- 55contracts46 completed + 9 ongoing
- 276substations in operation154 kV and 400 kV
- approx.3.92billion TRYtotal contract volume
- Completed · 46 contracts
- 667.49million TRY
- Ongoing · 9 contracts
- approx.3.25billion TRY
ONGOING WORK
Ongoing work
Substations per province
- 2–4
- 5–9
- 10–15
- 16–30
- 31+
Work packages
- İzmir Lot 5İzmir33 substations
- İzmir Lot 6İzmir, Manisa30 substations
- Kayseri Lot 17Kırşehir, Sivas, Yozgat20 substations
- Trabzon Lot 21Artvin, Giresun, Gümüşhane, Rize, Trabzon35 substations
- Gaziantep Lot 18Gaziantep, Kahramanmaraş, Kilis, Şanlıurfa32 substations
- Antalya Lot 27Antalya27 substations
- Adana Lot 25Adana, Hatay, Osmaniye37 substations
- Batman Lot 23Batman, Diyarbakır, Mardin, Siirt, Şırnak33 substations
- Şanlıurfa (9th package)—— substations
Substations by province
| Province | Subst. | 154 kV | 400 kV | Work package |
|---|---|---|---|---|
| AdanaAdana Lot 25 | 21 | 21 | 0 | Adana Lot 25 |
| AntalyaAntalya Lot 27 | 27 | 23 | 4 | Antalya Lot 27 |
| ArtvinTrabzon Lot 21 | 8 | 7 | 1 | Trabzon Lot 21 |
| BatmanBatman Lot 23 | 4 | 3 | 1 | Batman Lot 23 |
| DiyarbakırBatman Lot 23 | 10 | 9 | 1 | Batman Lot 23 |
| GaziantepGaziantep Lot 18 | 15 | 12 | 3 | Gaziantep Lot 18 |
| GiresunTrabzon Lot 21 | 8 | 7 | 1 | Trabzon Lot 21 |
| GümüşhaneTrabzon Lot 21 | 4 | 3 | 1 | Trabzon Lot 21 |
| HatayAdana Lot 25 | 11 | 11 | 0 | Adana Lot 25 |
| İzmirİzmir Lot 5, İzmir Lot 6 | 48 | 40 | 8 | İzmir Lot 5, İzmir Lot 6 |
| KahramanmaraşGaziantep Lot 18 | 13 | 9 | 4 | Gaziantep Lot 18 |
| KırşehirKayseri Lot 17 | 3 | 3 | 0 | Kayseri Lot 17 |
| KilisGaziantep Lot 18 | 2 | 2 | 0 | Gaziantep Lot 18 |
| Manisaİzmir Lot 6 | 15 | 13 | 2 | İzmir Lot 6 |
| MardinBatman Lot 23 | 10 | 9 | 1 | Batman Lot 23 |
| OsmaniyeAdana Lot 25 | 5 | 5 | 0 | Adana Lot 25 |
| RizeTrabzon Lot 21 | 6 | 5 | 1 | Trabzon Lot 21 |
| SiirtBatman Lot 23 | 4 | 3 | 1 | Batman Lot 23 |
| SivasKayseri Lot 17 | 10 | 8 | 2 | Kayseri Lot 17 |
| ŞanlıurfaGaziantep Lot 18 | 2 | 2 | 0 | Gaziantep Lot 18 |
| ŞırnakBatman Lot 23 | 5 | 4 | 1 | Batman Lot 23 |
| TrabzonTrabzon Lot 21 | 9 | 9 | 0 | Trabzon Lot 21 |
| YozgatKayseri Lot 17 | 7 | 6 | 1 | Kayseri Lot 17 |
| Total · 23 provinces | 247 | 214 | 33 |
COMPLETED WORK
Completed work
The 46 contracts completed in 2018–2025 total 667.49 million TRY.
Examples of scope: operation of 154 kV and 400 kV substations, periodic inspection, maintenance and repair, fault clearance and security services.
Contracts by year
- 20181 contracts
- 20196 contracts
- 20209 contracts
- 202110 contracts
- 202215 contracts
- 20242 contracts
- 20253 contracts
- Total46 contracts
FROM THE FIELD
Where we work

Substation 
Switchgear room 
Periodic inspection 
Switchyard
SOLAR REFERENCE
Elmadağ, Ankara
approximately 5 MWCompleted
A solar power plant of approximately 5 MW installed capacity in Elmadağ, Ankara, completed by Bozak Enerji.
Reference institutions
(opens in a new tab)TEİAŞTurkish Electricity Transmission CorporationPublic body
(opens in a new tab)EÜAŞElectricity Generation CompanyPublic body
(opens in a new tab)TKİTurkish Coal EnterprisesPublic body
Request a quote for your facility.
Fill in the form or message us on WhatsApp. We will prepare a written quote and get back to you.